Streatham Hub Development, Streatham High Road, London Client: Vinci Construction (UK) Limited Contract period: 12 months Description: 120 minute rated intumescent painting to Tesco Extra supermarket with 2 floors of underground parking below and 6 floors of apartments above plus 90 minute work to Leisure Centre situated in close proximity which included swimming pool and ice rink. Fire stopping was also required, along with air & acoustic sealing. Finally, air leakage testing services were provided to all buildings.